The Sana'a city, represented by the Executive Unit for the Construction, Maintenance, and Development of Roads and Public Places, carried out during the past week, restoration and maintenance work in the streets affected by torrential rains in various districts. The works, carried out by the field emergency teams of the Executive Unit, included the restoration of pits and landings, filling them with a layer of asphalt, tamping the base layer, and cleaning and removing waste in the targeted affected streets. The director of the executive unit, Eng. Abdul Malik Al-Ansi told Saba that the unit has mobilized all its energies and capabilities, and assigned some technical and engineering field teams to carry out maintenance and restoration work on streets affected by torrential rains, mobilize potholes, and repair asphalt landings. He pointed out that the unit is implementing the emergency and preventive periodic maintenance project, and the work included the maintenance, rehabilitation, and development of manho les and streams of torrents after the financial bridge and the Central Security neighborhood in the seventy, as well as filling pits and landings with asphalt on Arbaeen Street and the tour of culture and the surrounding streets. Al-Ansi pointed out that the other technical teams targeted the maintenance and restoration of potholes on the street extending from the tour of Al-Jamana to the tour of Amran, and the TV Street in western Jiraf, as part of the emergency project funded by the local council in Sanaa city. The asphalt maintenance and restoration work, carried out by the field teams, included cleaning, identification, spraying, and filling potholes with hot asphalt in flood-affected streets, starting from the intersection of Al Daeri Street to the end of Rabat Street, as well as the streets of Djibouti, he said. The director of the executive unit confirmed that work is underway at a high pace in the implementation of restorations, and the addition of asphalt layers in several streets in the capital's cities affected by the floods. He pointed to the continuation of the work of the emergency unit teams in mobilizing emergency excavations that obstruct traffic, and repairing and filling asphalt landings in various streets of Sanaa's districts, according to the fieldwork plan. Source : Yemen News Agency
Related Articles
Demonstration to demand the improvement of electricity north of Hilla
Dozens of residents of Saddat Al-Hindiya district demonstrated this evening, Monday, in front of the district building, to demand an improvement in electricity and an increase in the supply share. “NINA” reporter said, “Dozens of residents of the Al-Hindiya district demonstrated this evening, Monday, in front of the district building, to protest against the increase […]
UNRWA Delivers Critical Aid to Gaza Amid Conflict, Famine, and Financial Strain
Gaza city: The United Nations Relief and Works Agency for Palestine Refugees in the Near East (UNRWA) continues its efforts to provide essential assistance to nearly 2 million Palestinians in the Gaza Strip, who are experiencing the harsh realities of…
Israeli Forces Intensify Military Operation in Tulkarm for Third Consecutive Day
Tulkarm: For the third consecutive day, Israeli forces have continued a wide-scale military operation in the city and camp of Tulkarm, leading to extensive destruction of infrastructure and citizens’ properties. A young man was shot in the head by sni…
